We are inviting singles (18+), married couples, and seniors.
We are organizing an exciting opportunity for alumni and friends to spend one week on the Emmanuel College campus to help complete urgently needed construction and repair projects that will assist Emmanuel in fulfilling their mission of preparing the next generation of world changers for Christ! Look at the bottom of this page to view a list of projects we completed during EC MISSION 2018.
(The truth is - Emmanuel has been forced to cut their maintenance crew back to “barebones!” There is just not enough time or personnel to get everything done that needs to be done.)
EC Mission 2019 begins Sunday afternoon, June 9 to Saturday, June 15.
You will have the opportunity to use your skills each day to improve the campus in critically needed areas.
You will work during the day and then relax and play in the evenings. We will have a few short organizational meetings during the week.
Why not for Emmanuel?
Why not EC MISSION 2019!
See STEP 3 for the details on fees and logistics.
Completed Projects During EC MISSION 2018 -
1. Deep clean 11 classrooms in Aaron
2. Spot clean carpet in Aaron
3. Deep clean the ARC room in Aaron
4. Clean baseboards and vacuum hallway in Aaron
5. Tightened all chair screws in classrooms of Aaron
6. Deep clean 7 classrooms in Science Center
7. Cleaned all furniture in lobbies of Jackson, Hartsfield, Melton and Drum dorms
8. Deep clean Jackson lobby
9. Placed different furniture in Jackson lobby
10. Clean paint off Jackson door
11. Sort furniture in Jackson study room
12. Curtains up in Jackson lobby
13. Placed puzzles in Jackson lobby
14. Sort and organize utility room in Jackson
15. Lamp and picture out of Jackson foyer
16. Cut down overgrown trees at Jackson entrance
17. Clean mat at Jackson entrance
18. Weed, prune, trim bushes on Quad
19. Edging on Quad (huge project)
20. Paint Marshburn Conference room
21. Paint doorway and touch-up in Marshburn
22. Vases out of Lobby in Swails
23. Removed benches from Swails hallway to be cleaned
24. Placed couches in Swails lobbies
25. Extension cord 8’ for lamps in Jackson and light bulb
26. Replaced screws on two handrails in Jackson to secure them better
27. Sort and organize storage room in Hutchinson
28. Removed old silk plants from Hutchinson Room
29. Checked all chairs in Dining room for loose screws and tightened where needed
30. Sort and organize utility room in Swails
31. Removed all wallpaper and baseboards from Marshburn Conference room in Swails
32. Removed wall to wall carpet in Marshburn Room
33. Removed old tile beneath carpet in Marshburn Room (prepared for new carpet)
34. Swails Center - reworked all flower beds & put out pine straw & trimmed bushes at side
35. Redecorate women’s bathroom in Swails
36. Placed inspirational words and scriptures on walls in Swails
37. Weeding Science
38. Weeding Library
39. Weeding at Drum
40. Weeding at both main entrances and along the main highway
41. Weeding and spruce up and pine straw entrance at Admission office
42. Weeding at Student Life building
43. Weeding at Coffee Shop
44. Weeding at Nash Hall
45. Collected and disposed of yard waste piles all around where weeding took place
46. Straightened and rearranged furniture in Roberson lobby
47. Painted Drum lobby
48. Remove rotten deck boards on ramp of girls Lacrosse locker room and office
49. Replaced all decking on ramp at girls Lacrosse
50. Built new steps at girls Lacrosse
51. Built 3 ft hanging wall (60 feet wide) and 4 ft side walls on Swails stage
52. Painted new stage wall build out at Swails
53. Built handrail on rear stairs at Jackson RD entrance
54. Built handrail for two story stairs and porch at baseball field
55. Cleaned and straightened concession stand at baseball field
56. Cleaned area of bleachers at baseball field
57. Built two portable panels needed for stage in Swails